Related items
Showing items related by metadata.
-
BrochureBiomass from Reeds as a Substitute for Peat in Energy Production
Sporovo region, Belarus (N 52.379330, E 25.136771)
2015Also available in:
No results found.More than half of Belarus’ total peatland area (over 1.5 million ha) has been drained for agriculture, forestry and peat extraction. Out of this area, 122 200 ha are cutover peatlands that have been abandoned after peat excavation, and 36 800 ha are still being utilized. During the last few years, about 50 000 ha of drained peatlands have been rewetted. Another 500 000 ha are potentially available for hydrological restoration. -
BrochureSphagnum Farming for Replacing Peat in Horticultural Substrates
Rastede, Lower Saxony, Germany (53° 15.80′ N, 08°16′ E)
2015Also available in:
No results found.Sphagnum (peat moss) biomass provides a GHG-neutral alternative to fossil peat in professional horticulture. So far however, it has only been collected in the wild. Small-scale land-based Sphagnum farming is currently practiced on degraded peatlands. Sphagnum farming has also been tested on specially constructed floating mats that guarantee a constant water supply. This water–based cultivation allows bog waters to be used as reservoirs to irrigate cultivated areas in dry periods. -
BrochureRehabilitation of the Bog Achternmeer Combined with the Utilization of Peat
Community Wardenburg, Region Oldenburg, Lower Saxony, Germany (53°04´16.50" N; 8°05´47.40" E)
2015Also available in:
No results found.The project ‘Rehabilitation of the bog Achternmeer by utilization of the peat’ combines the mining of peat from a bog previously used for agricultural purposes with continuous rewetting and the development of transition bog vegetation.The advantage of the applied excavation method (upper– and subfield process) is that the rewetting of the cutover subfields starts in the first year. The part of the peat profile which is planned to be excavated will be removed with a hydraulic excavator in once do wn to the rewetting horizon. This process will be done in several slots of 5 m to 15 m width in a year. During the following years the rewetted slat will expand continously until the complete field is at the level of the planned watertable.
Users also downloaded
Showing related downloaded files
No results found.